Construction industry studies indicate that 80% of any potential cost savings or increased value in a project occur during the first 20% of the total project duration — prior to construction. H&M approaches each project with the belief that the most critical phase of any project is the pre-construction phase.
80% of Increased Value or Potential Cost Savings is Determined in the First 20% of Project Schedule
Our pre-construction services include: